Critics of a plan to relocate the Line 5 pipeline into a tunnel beneath Great Lakes waters argue Enbridge’s own federal filings prove there’s no need for the infrastructure to be built. Read the full story by MLive.
Line 5 tunnel could be a ‘stranded asset’ in 20 years, report suggests
Posted on by Great Lakes Commission
More From Author
Test your Great Lakes knowledge
18 December 2024
MillerKnoll to eliminate PFAS from North American products
18 December 2024