Enbridge Energy last week sought help from a state oversight panel due to the “inexplicably lethargic” permit review by federal regulators for the company’s Great Lakes Tunnel Project to replace Line 5 under the Straights of Mackinac. Read the full story by WDET – Detroit, MI.
Enbridge frustrated by lengthy delay in Line 5 tunnel project
Posted on by Great Lakes Commission
More From Author
The Advisor E-Newsletter: December 2024
20 December 2024
Michigan DNR collects 6.5 million wild coho salmon eggs
20 December 2024