The price tag for London’s now-being-built bus rapid transit system has increased by more than 50 per cent as the rising cost of real estate and construction pushes the total to $454 million. Read More
The price tag for London’s now-being-built bus rapid transit system has increased by more than 50 per cent as the rising cost of real estate and construction pushes the total to $454 million. Read More