Floodplain restoration work continues on 7-acre area along Blanchard River

Crews continue work restoring a floodplain that will also serve as a living laboratory for students along the Blanchard River in Findlay, OH. Local middle school students even helped contribute to the design of the seven-acre project site through the Great Lakes Sediment and Nutrient Reduction Program (GLSNRP), which is headed by the Great Lakes Commission. Read the full story by WTVG-TV – Toledo, OH.

More From Author

Lake Superior climate monitoring, maritime safety buoys deployed for season

Calls for change as Pride flag raised in Owen Sound

Categorized Tag Cloud